Blog / Insights
Articles and guides to developing and financing large-scale power
GIS Power articles on cogeneration, data centers, industrial parks and regulation, plus the site’s reference guides: how a generation project in Mexico is contracted, structured, permitted and connected.
Articles
Most recent firstGIS Power joins CANACO Servytur San Juan del Río
Membership and a briefing by Winston D. Wallis on the group’s track record.
Read the articleAI and energy: how much electricity a data center needs
What the IEA and Epoch AI say, and how an AI data center is powered and cooled.
Read the articleCogeneration for data centers: a technical guide
N+1 and 2N redundancy, absorption cooling, PUE and solar with BESS.
Read the articleBiotek · Cuadritos, Mexico’s first green industrial park
A park designed around its own generation, and what it teaches today.
Read the articleHow much does cogeneration cost in Mexico?
What drives the investment and the cost per kWh, and how it is paid for.
Read the articlePower for data centers: when the grid cannot arrive in time
Interconnection as the bottleneck and a developer’s options.
Read the articleThe Alestra case: the first data center with cogeneration in Mexico
4.2 MW with absorption: 100% of power and chilled water on site.
Read the articleMexico’s Electricity Sector Law: what industry needs to know
Generation figures, self-supply, cogeneration, clean energy certificates and mixed schemes.
Read the articleEnergy savings for plant managers: 12 strategies
From assessment and power factor to on-site generation.
Read the articleWhat cogeneration is and when it fits industry
How it works, which technologies exist and what the law says.
Read the articleContracting and finance
Who invests, who owns and how it is paidContracting models
PPA, energy as a service, BOOT and lease, loan or cash purchase: what changes in each structure.
Read the guide Guide · StructureSPV structure
Why each project sits in its own company and what lenders require.
Read the guide Guide · ProcessProject lifecycle
From feasibility to financial close, construction, commercial operation and O&M.
Read the guide Guide · RegulationMixed and private schemes
Projects in which CFE holds at least 54%, under the Electricity Sector Law.
Read the guidePermits and grid
CNE, CENACE and the Electricity Sector LawHave a specific question?
Write to us: location, demand and stage help us give you a better answer.
By sending you accept our privacy notice.
