Skip to content
GIS Power Contact
Home/Investors The Power to Profit® +52 (442) 529 6184info@gis-power.com
For funds and investors

Investors

Energy projects structured for project finance

Development pipeline
USD 129 Min power generation projects in Mexico
Projects
15across several Mexican states
Capital required
85%of the pipeline amount
Contract term
48–180 monthsof contracted energy

Investors

Energy projects with development, construction and operations under one roof

GIS Power originates, develops and structures power generation projects in Mexico, each in its own special purpose vehicle (SPV), with long-term energy contracts. We are raising equity and project debt to take them to construction and to operate them for the life of the contract.

Provisional, aggregated figures for the GIS Power pipeline. Project-level detail is shared under a confidentiality agreement.

The thesis

Contracted energy, infrastructure operated for decades

Mexico’s industry, industrial parks and data centers need continuous power and cannot always wait for the grid. An on-site generation project, with a long-term energy contract with a creditworthy user, turns that need into predictable cash flows.

GIS Power brings what makes a project bankable: origination and development, permits, design and construction, and operations with contractual availability. The group has done this work in critical infrastructure since 1983 and has operated power plants in Mexico since 2009.

Our core offering is solar with battery storage (BESS) as primary power, with cogeneration where there is thermal demand.

When we are not your counterparty

  • If you need short-term liquidity: these are long-term assets.
  • If you are looking to acquire operating assets: our pipeline is in development and construction.
  • If your mandate excludes construction risk.

Structure

How each project is structured

What you will find in the data room
01

One SPV per project

Ring-fenced assets, contracts and debt, with each investor’s stake held in that company.

02

Energy contract

PPA, energy as a service or BOOT with the user, with a defined rate, term and performance targets.

03

Payment trust

The user’s payments flow into a trust that services the debt first.

04

Permits and interconnection

With CNE and CENACE, with the path and status of each filing documented.

05

Single-point EPC

Design, procurement and construction with brand-authorized commercial partners.

06

O&M and asset management

24/7 operations with contractual availability and regular investor reporting.

Risk is ring-fenced in each project

The SPV holds the plant, the contracts and the debt; user payments flow through a trust that serves debt first.

Takeaway

The investor assesses one asset with its own contract and cash flow, not the user’s or GIS Power’s balance sheet.

The user pays for energy, not for the plant: that is why your company does not need to invest.

Typical project finance structure.

Why now

Official data

2.5%

Annual consumption growth

Gross electricity consumption, 2025–2039, planning scenario. SENER, Electricity Sector Development Plan, Official Gazette, Oct 17, 2025.

8,026MW

Awarded under mixed schemes

Solar and wind projects with private capital and at least 54% CFE participation. CFE, Development Program 2026–2030.

30years

Maximum term of a mixed scheme

Regulations of the Electricity Sector Law, art. 73, Official Gazette, Oct 3, 2025.

100%

Deductible in year one

Solar and efficient cogeneration equipment, with a minimum of 5 years of operation. Income Tax Law, art. 34, sec. XIII.

Mexico’s electricity demand will grow 41% by 2039

Gross electricity consumption, index 2025 = 100, at the planning scenario’s 2.5% a year.

Takeaway

Growth of 2.5% a year compounds to 41% over 14 years. Generation has to keep pace, and not all of it can wait for the grid.

That is the space for on-site generation under long-term contracts.

SENER, Electricity Sector Development Plan, DOF Oct 17, 2025.

How we work with investors

From first conversation to close

We share information in order: first the aggregate view and, once confidentiality is signed, the detail of each project.

  1. 01 · Confidentiality agreement

    We sign an NDA to share pipeline information.

  2. 02 · Teaser

    The pipeline with its size, terms and structure, project by project.

  3. 03 · Data room

    Financial models, contracts, permits and engineering for your due diligence.

  4. 04 · Terms

    Participation structure in each SPV and closing conditions.

  5. 05 · Close and construction

    Financial close, construction and reporting during operations.

The track record behind the pipeline

Since 1983

2,900+GWh

Generated in Mexico

By the group’s plants.

430,000+h

Of continuous operation

Cumulative, across 5 plants.

13

Mission-critical facilities

Data centers and critical facilities in 3 countries.

USD 500M+

In critical infrastructure

Since 1983.

Frequently asked questions

What kind of investor are you looking for?

Infrastructure and energy funds, family offices, development banks and commercial banks, for equity or project debt.

Can I invest in a single project?

Yes. Each project sits in its own SPV, so participation can be set per project or for a group of projects.

Who operates the plants after close?

GIS Power, under an operations and maintenance contract with contractual availability, for the life of the energy contract.

Are the pipeline figures final?

No. They are provisional, aggregated figures; updated detail is shared with the teaser, under a confidentiality agreement.

Request the teaser under NDA

Tell us about your mandate: type of capital, ticket size and sectors.

By sending you accept our privacy notice.