International
Projects in four countries since 1983
The group was born in Tampa, Florida, in 1983 and from the start worked for telecom and technology clients in the United States and Mexico. Since then it has designed and built data centers, critical power systems and generation plants in Mexico, the United States, the Bahamas and Brazil.
4
Countries with projects
Mexico, the United States, the Bahamas and Brazil
1983
Since
ESI begins operations in Tampa, Florida
13
Mission-critical facilities
In Mexico, the United States and Brazil
4
Offices
Mexico City, Querétaro, León and Tampa, FL
Projects by country
ESI, PMI and GIS PowerMexico
| Project | Location | Year | Scope |
|---|---|---|---|
| Residencial Bosque Real | Huixquilucan, State of Mexico | 2009 | EPC + O&M, isolated supply, 7.5 MW |
| Alestra Green Data Center | Querétaro | 2013–2014 | EPC, data center with 4.2 MW of cogeneration |
| Biotek · Cuadritos Industrial Park | Celaya, Guanajuato | 2012–2015 | EPC, 4.8 MW of cogeneration and a dedicated gas pipeline |
| Logistik Industrial Park | San Luis Potosí | 2018 | EPC, 9.5 MW of biogas-fired generation |
| Pronal (Productora Nacional de Papel) | Villa de Reyes, San Luis Potosí | 2019 | EPC, 10 MW |
| Mexico City Airport Terminal 2 | Mexico City | 2006 | Tier 4 data center, design-build |
| GTE Data Services Mexico | Mexico City | 1998 | Data center, design-build |
| PwC, national headquarters | Mexico City | 1999 | Cogeneration and absorption chillers |
| Telmex | Mexico City | 1994 | Redundant power for a switching facility |
| BBVA Bancomer, Lago Esmeralda | Mexico City | 2014 | Cogeneration feasibility study, 4 MW |
| Televisa Chapultepec and San Ángel | Mexico City | 2005–2006 | Cogeneration study and engineering, 5 MW |
| Proteinol | Mérida, Yucatán | — | Design, 12 MW |
United States
| Project | Location | Year | Scope |
|---|---|---|---|
| GTE Data Services Technology Center, phases I–III | Tampa, FL | 1987–1994 | Design, program management and construction |
| GTE Data Services | Fort Wayne, IN | 1992–1993 | Data megacenter, design-build |
| GTE Data Services | Sacramento, CA | 1993–1994 | Data megacenter, design-build |
| AT&T Solutions | Jacksonville, FL | 1998 | Generators and switchgear for a 24/7 data center |
| DIGEX Web Farm | Maryland | 1999 | N+1 and N+N web farm |
| Nielsen Media Research | Dunedin, FL | 1999 | Data center and paralleled generation |
| TSA, 72 airports | United States | 2002–2003 | High-availability power for security equipment |
The Bahamas
| Project | Location | Year | Scope |
|---|---|---|---|
| Baker's Bay Golf & Ocean Club | The Bahamas | 2020–2023 | Joint EPC, 7 MW hybrid plant with solar and BESS |
Brazil
| Project | Location | Year | Scope |
|---|---|---|---|
| Telemar, phases I and II | Rio de Janeiro | 2001–2002 | Data centers with 6 MW of redundant cogeneration |
| TNEXT Data Center | Rio de Janeiro | 2002 | Data center and web farm, design-build |
Source: PMI International project history and GIS Power company profile.
How we work outside Mexico
As part of the PMI International groupGIS Power is the Mexican energy operations subsidiary of the PMI International group, headquartered in Tampa. Projects outside Mexico are developed through the group’s structure and, when the project calls for it, as joint ventures, as at Baker’s Bay.
Regulation, permits and interconnection change from country to country. The method does not: solar with BESS as primary power where it makes sense, mission-critical redundancy and an operations team accountable for availability.
When it is not a fit
- When the project needs a local contractor for minor civil works: the group comes in where there is engineering, power and long-term operations.
- When the country does not allow private on-site generation and there is no interested public counterparty.
Frequently asked questions
Does GIS Power develop projects outside Mexico?
Yes, as part of the PMI International group. The group has projects in the United States, the Bahamas and Brazil, in addition to Mexico.
Where are your offices?
In Mexico City, Querétaro, León and Tampa, Florida.
How are ESI, PMI and GIS Power related?
They are one line: ESI began operations in Tampa in 1983, PMI was formed in 2001 with the acquisition of ESI, and GIS Power in 2014. That is why the project history is presented as the group’s.
Let’s talk about your project
Country, location, project type and stage: that is where we start.
By sending you accept our privacy notice.