Projects · Huixquilucan, Mexico · 2009
Residencial Bosque Real
Mexico’s first permit to supply a residential and commercial development with self-generated power. Since 2009, the plant has been the development’s electricity supply.

7.5MW
Capacity
Huixquilucan, Mexico
2009
Year
2009
990+GWh
Energy generated
Estimated to date
Design, construction and operations (EPC + O&M)
Scope
What was done
Bosque Real chose the group as its partner to power the entire development. The group engineered, installed and commissioned the plants, and operated and maintained them from 2009 to 2016.
The plant runs islanded, independent of the grid: five engines, three of 2,000 kWe and two of 750 kWe, for 7.5 MW in total. It is still running today and is the residences’ electricity supply.
Technical summary
- 5 engines: 3 × 2,000 kWe + 2 × 750 kWe
- Islanded, no grid connection
- First residential and commercial self-supply permit (2009)
- Operations and maintenance by the group from 2009 to 2016