A plant is worth what it delivers every day

GIS Power operates and maintains power plants 24/7, with availability set in the contract. It is the stage that sustains a project’s payments over its whole life, and the one a lender reviews most closely.

Control room of a power plant

24/7

Operation

With availability set in the contract

2009

Bosque Real

EPC and, from 2009 to 2016, operation and maintenance of an isolated-supply plant

990+GWh

Bosque Real

Energy generated, estimated to date

430,000+h

Group plants in Mexico

Estimated operating hours

Operation with a measurable commitment

Availability is agreed, measured and reported

A GIS Power operation and maintenance contract sets the availability the plant must deliver, how it is measured and what happens if it falls short. With that, the plant owner, the energy user and the lender know what to expect and how to verify it.

We operate what we build: solar plants with storage (BESS), hybrids, cogeneration and engine plants. We can also take over the operation of an existing plant, after assessing its condition.

When it is not a fit

  • If your plant is small and your in-house team already runs it well, with the manufacturer’s support.
  • If you only want corrective repairs when something breaks: this service is built on prevention and an availability commitment.
  • If the plant has no metering or controls to verify availability: those have to be installed first.

Scope

What operation and maintenance includes

One party accountable
01

24/7 operation

On-site shifts or remote supervision, depending on the plant and the contract.

02

Preventive maintenance

A program by operating hours and by manufacturer, for engines, inverters, batteries and electrical equipment.

03

Corrective maintenance

Fault response with agreed response times.

04

Spare parts

Critical stock on site and supply through brand-authorized commercial partners.

05

Monitoring

Plant controls and metering to operate it and verify availability.

06

Compliance

Tracking of permit, interconnection and environmental obligations.

Asset management

Thinking about the plant’s whole life

Running the plant well today is half the job. The other half is planning engine overhauls, battery and inverter replacements and expansions, so the plant keeps meeting its contract until the last month.

  1. Start-up

    Commissioning, performance tests and handover with the plant’s baseline.

  2. Operation

    Availability, energy delivered and fuel use measured every month.

  3. Major maintenance

    Overhauls and replacements scheduled in advance, with their financial reserve.

  4. End of contract

    Renewal, transfer of the plant under a BOOT, or decommissioning, depending on the model.

Reporting

For the owner, the user and the lender
ReportWhat it containsFor whom
Monthly operationsAvailability, energy generated and delivered, fuel, events and faultsOwner and energy user
MaintenanceWork completed, scheduled and pending; spare partsPlant owner
Contract performanceAgreed indicators against measured resultsOwner, user and lender
CompliancePermit, interconnection and environmental obligationsOwner and lender

The content and frequency of each report are set in the operation and maintenance contract.

Reference: Residencial Bosque Real

Huixquilucan · 2009 · EPC + O&M 2009–2016

At Bosque Real, the group carried out the engineering, installation and commissioning of a 7.5 MW plant on isolated supply, as well as its operation and maintenance from 2009 to 2016. With no grid behind it, the plant has to be available every day: it is still operating today and is the homes’ electricity supply.

Engines at the Bosque Real plant
Power plant distribution switchboards Control system at the Cuadritos plant Control room at Pronal Engines at the Cuadritos plant

Frequently asked questions

What availability do you guarantee?

The level agreed in each contract, based on the technology, the plant’s redundancy and what the load needs. The contract defines how it is measured and what happens if it is not met.

Can you operate a plant you did not build?

Yes, after assessing its condition, maintenance history and controls. If needed, what is necessary is fixed first so that an availability level can be committed.

Is operation included in a PPA?

Yes. In the models where the SPV invests (PPA, energy as a service and BOOT), operation and maintenance are included. If your company buys the plant, they are contracted separately.

How long is an operating contract?

It usually runs alongside the energy contract: from 48 to 180 months, depending on the scheme.

Let’s discuss your plant

Technology, capacity, location and current condition: that is where we start.