Power purchase agreement (PPA)
You pay only for the energy you use, at an agreed rate. The SPV owns the plant; GIS Power operates it.
A fit if your demand is stable and you want the asset off your balance sheet.
PMI International group · Critical infrastructure since 1983
Solar and battery storage (BESS) as primary power for data centers, industrial parks and industry, in Mexico and across the Americas. One accountable party, from site to operations.
Who we serve
Contracting models
You pay only for the energy you use, at an agreed rate. The SPV owns the plant; GIS Power operates it.
A fit if your demand is stable and you want the asset off your balance sheet.
A monthly fee for capacity, availability and operations, with contractual performance targets.
A fit if what you are paying for is continuity: data centers and critical processes.
The SPV builds, operates and collects during the term; at the end, the plant transfers to your company.
A fit if you want long-term ownership with no upfront outlay.
Your company owns the plant from day one and pays in installments or upfront.
A fit if you have the balance sheet and want the full savings.
Contract terms of 48 to 180 months, depending on the model. Compare the models
How a project gets built
Site, demand, solar resource and technical and financial feasibility.
CNE permits, CENACE interconnection, environmental and social impact, gas.
SPV, payment trust, energy contracts and financial model.
Equity and project debt, with banks and funds.
Full EPC with brand-authorized commercial partners.
24/7 O&M with contractual availability and asset management for the life of the contract.
Projects
Capacity, start year and estimated energy to date.
Villa de Reyes, SLP · 2019
San Luis Potosí · 2018 · biogas
Huixquilucan · 2009 · first residential permit
Celaya · 2015 · first green industrial parkCumulative capacity of the group’s plants in Mexico, by start-up year.
Takeaway
This is not a one-off project: the group commissioned a new plant every one to three years between 2014 and 2019, and all five are still running.
For an investor, that is a repeated execution track record.
Source: PMI International and GIS Power track records.

Green Data Center by GIS Power
Solar and BESS as primary power, with the grid and gas as backup. Built in phases: it can start with a few MW and grow with the IT load.
Why now
Official planning expects Mexico’s gross electricity consumption to grow 2.5% a year from 2025 to 2039.
SENER, Electricity Sector Development Plan 2025–2040, Official Gazette (DOF), Oct 17, 2025.
CFE has already awarded 8,026 MW of solar and wind projects under mixed development schemes, with private capital and at least 54% CFE participation.
CFE, Development Program 2026–2030, Jul 2026; Electricity Sector Law, art. 40.
Machinery and equipment that generate power from solar or efficient cogeneration can be fully deducted in the year of the investment, if they operate for at least 5 years.
Income Tax Law (LISR), art. 34, sec. XIII.
Gross electricity consumption, index 2025 = 100, at the planning scenario’s 2.5% a year.
Takeaway
Growth of 2.5% a year compounds to 41% over 14 years. Generation has to keep pace, and not all of it can wait for the grid.
That is the space for on-site generation under long-term contracts.
SENER, Electricity Sector Development Plan, DOF Oct 17, 2025.
For funds and investors
Each project sits in its own SPV, with long-term energy contracts and development, construction and operations under one roof.
Provisional, aggregated figures for the GIS Power pipeline.
The mission-critical engineering and construction firm is founded.
An 800,000 ft² technology center in Tampa. USD 75 M.
Cogeneration and absorption chillers in Mexico City.
Data centers in Rio de Janeiro with 6 MW of redundant cogeneration.
Tier 4 data center for Mexico City International Airport.
35,000 m² in Querétaro, with 100% of its power and chilled water produced on site.
Solar and BESS as primary power, built in phases.
ESI and PMI clients since 1983


Also: ASA, Bosque Real, Cuadritos, ICA/Fluor, Logistik, Nielsen, Productora Nacional de Papel and Telemar.
Brand-authorized commercial partners

Write to us whatever the size. We review each request by its demand, location and stage, and reply with the path that suits it best, including projects that start with a few MW and grow in phases, such as a Green Data Center.
Not necessarily. Under a power purchase agreement, energy as a service or a BOOT scheme, the project company makes the investment and your company pays for the energy or the service.
It is a company created for a single project. It ring-fences the project’s assets, contracts and debt from those of its sponsors, and it is what banks and funds require in order to finance it.
Because the sun has no fuel cost and storage delivers that energy when it is needed, including at night. The grid and, where it makes sense, gas or cogeneration serve as backup.
Download
Who we are, what we do, how to contract and the group's projects, in 4 pages to share with your team.
Download the profile (PDF, 1 MB)Location, demand and stage: that is all we need to start.
By sending you accept our privacy notice.