Projects · Celaya, Mexico · 2012–2015
Biotek · Cuadritos Industrial Park
Mexico’s first Green and Sustainable Industrial Park. A cogeneration plant that supplies power and steam to the park’s industry, with its own gas pipeline from PEMEX.

4.8MW
Capacity
Celaya, Mexico
2015
Year
2012–2015
400+GWh
Energy generated
Estimated to date
Design and construction (EPC) and pipeline
Scope
What was done
For Grupo Industrial Cuadritos and Biotek Power, the group handled every phase: design, procurement, construction, installation and start-up of the park’s first cogeneration plant.
Lean-burn GE Jenbacher engines work with Aprovis heat recovery boilers producing 4 tons of steam at 7 bar, feeding the existing steam headers.
The project included a dedicated pipeline to bring natural gas directly from PEMEX to the park.
Technical summary
- Lean-burn GE Jenbacher engines
- Aprovis heat recovery boilers
- 4 t of steam at 7 bar
- Dedicated gas pipeline from PEMEX
- Project investment: USD 11 M