Projects · Querétaro, Mexico · 2013–2014

Alestra Green Data Center

The first data center powered by cogeneration in Mexico. The group designed, built and commissioned Alestra’s modular data center and the plant that supplies 100% of its power and chilled water.

Alestra Green Data Center building

4.2MW

Capacity

Querétaro, Mexico

2014

Year

2013–2014

400+GWh

Energy generated

Estimated to date

Full design and construction (EPC)

Scope

What was done

Alestra chose the group as its partner for a new data center in Querétaro: design, construction, fit-out and commissioning of a 35,000 m² modular facility, with 3,500 m² of white space in seven 500 m² modules.

The cogeneration plant, with two GE Jenbacher engines and two 350-ton absorption chillers, supplies the data center’s power and chilled water. The documented result was a 45% reduction in energy costs.

The project received DC Dynamics’ "Innovation in the Mega Data Center" award on October 1, 2014.

Technical summary

  • 35,000 m² modular data center
  • 3,500 m² of white space in 7 modules
  • 2 GE Jenbacher engines
  • 2 absorption chillers of 350 tons
  • 100% of power and chilled water on site
  • Project investment: USD 31 M