Utility-scale solar

Industrial and utility scale, with storage

Demand
2.5% a yeargrowth in gross electricity consumption, 2025–2039 (SENER)
Mixed schemes
4,897 MWof solar PV awarded in 30 projects with CFE
CFE share
≥ 54%in mixed projects (LSE art. 40)
Self-supply
0.7–20 MWsimplified process possible (LSE art. 30)

Utility-scale solar

Solar power at the scale of your operation

An industrial or utility-scale solar park is the core of GIS Power’s approach: solar as primary power, with storage (BESS) that carries it into the hours without sun. We develop it, finance it through a project company, build it and operate it.

What a large-scale solar park is

Generation, storage and interconnection in one project

It is a photovoltaic plant sized for an industrial load, a development or energy sales, with its own substation, its interconnection and, more and more often, battery storage. Storage changes the role of solar: it stops being daytime power and becomes power delivered when the load calls for it.

Design starts from the load curve and the site’s solar resource. Those two inputs decide how much PV capacity to install, how much energy to store and what backup the plant needs to deliver what the contract promises.

When it is not a fit

  • If there is not enough land on site or a nearby property with a viable interconnection.
  • If your load is almost entirely at night and the storage it would take is not justified.
  • If you need firm power around the clock with no backup: the answer there is a hybrid, not solar alone.
  • If your operation at the site may close before the energy contract term.

On site or at a remote location

Two routes with different rules
On-site generationRemote generation
Where it sitsOn the load’s property or next to itOn land with a better resource or more area
How power arrivesDirectly to the load, with or without a grid connectionThrough the grid, with interconnection through CENACE
What favors itAvailable roofs, parking areas or owned landLarge loads or several sites of the same user
What must be solvedSpace, structure and protection of the existing installationLand, rights of way, interconnection and the permitting scheme

The route is set during feasibility, based on the load, the land and the available interconnection.

Scope

From feasibility to operation

One party accountable
01

Feasibility

Load curve, solar resource, land, interconnection and financial model.

02

Permits

With the CNE and CENACE, plus environmental and local approvals.

03

Finance

One SPV per project, with a 48 to 180 month energy contract as the source of repayment.

04

Engineering and construction

EPC with brand-authorized commercial partners, such as Huawei and Pylontech.

05

Storage

BESS sized to shift energy, shave demand peaks and ride through transients.

06

Operation

Operation and maintenance with contracted availability.

Permits

What Mexico’s Electricity Sector Law says

< 0.7MW

No permit

Exempt generator (LSE art. 19); distributed generation (LSE art. 25).

0.7–20MW

Simplified process possible

Grid-connected self-supply from 0.7 MW (LSE art. 30).

Surplus

Sold only to CFE

An intermittent plant that injects power must have its own backup or pay for it (LSE art. 32).

≥ 54%

Mixed schemes

CFE holds at least 54%, with a term of up to 30 years (LSE art. 40; Regulations art. 73).

Ley del Sector Eléctrico (LSE), DOF 18-Mar-2025; LSE Regulations, DOF 3-Oct-2025. Consumption growth: SENER, PLADESE 2025–2040, DOF 17-Oct-2025. Awarded MW: CFE, Programa de Desarrollo 2026–2030, Jul-2026.

Frequently asked questions

Can I sell my surplus power to the grid?

Surplus can only be sold to CFE, and an intermittent plant that injects into the grid must have its own backup or pay for it (LSE art. 32). That is why the park is sized to your load, and storage reduces the surplus.

Do I need storage?

It depends on your load curve. If you consume mostly by day, solar alone can cover a good share. If you consume at night or need firm power, the BESS is what lets the park cover those hours.

Have you built solar parks of your own?

The group’s own experience with solar and BESS generation is in hybrid plants, such as Baker's Bay in the Bahamas, with a 3 MW / 3 MWh BESS. The photos on this page illustrate the technology, not a specific project.

Who owns the park?

Either an SPV that sells you the energy, or your company, through a lease, a loan or cash. The models are compared on the contracting models page.

Let’s assess your site

Location, demand and available land: that is where we start.